Did It!

We have the first floor now almost completely converted from the old-style fluorescent fixtures, ballast transformers and tubes to the new-style LED tubes. We put fluorescents everywhere when we built because we liked the fact that they last a long time and give a really good amount of light.

We just learned that the tubes we have been using will no longer be made starting this August (!) so we really had no choice. My husband ordered a box of LED lights (count of 30). He got antsy waiting for the delivery, so he went to our local Yeager’s and bought the 6 tubes they had that were the color we had ordered online. We laboriously put the six in and then the box of 30 more arrived.

We have now finished the kitchen (above). Last night my husband sneaked in and converted the one in the pantry. (He said the last two tubes were “calling to him.”)

The only fixture left to be converted on the first floor now is the back bathroom, beyond the utility room.

Yesterday we spent all day converting these three fixtures in our office. We worked well together. In fact, my husband complimented me on what a good job I did helping him, anticipating which tool he would need when, etc., plus “helping him stay calm.” He cooperated with my insisting we take breaks, hydrate, eat lunch, etc. and this, I think, helped both of us a lot.

I’ve been having to flip the switch in the office 5 or 6 times each morning in an effort to get all three fixtures lit at the same time. Now, one flip and the room is ablaze in light! I keep finding myself expecting a light to suddenly go off. :0)

The tubes are expensive, but the regular fluorescents weren’t cheap, either. They are supposed to last 50,000 hours. They use less energy. They allowed us to get rid of the ballast transformers which were failing. Even though the conversion is a lot of work, these tubes may last longer than we do. :0)

We have another box ordered, but we have agreed (at least right now) to replace the upstairs tubes as they fail, rather than continue the race we’ve been on lately. Having been married to this man 54 years now, I know that this agreement will probably last until the delivery of the box of tubes, but at least I’ll get a break until the 20th, when the delivery is estimated.

Leave a comment

Filed under Challenges, Changes, Housekeeping - Maintenance, Lewis projects

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.