Phase 2 – Hummingbird Bird Bath Project

We finished the plumbing part of the hummingbird bird bath project today!  We had ‘gooed’ the drain pipe fitting last night and let it dry for 24 hours. We had to cut another hole in the bucket lid to accommodate the pipe coming from the bottom of the tub in a straighter fashion.  This set up will allow the bird bath to sit quietly when the pump is not on. When the pump IS on, the water recirculates from the tub, down into the bucket and back. The only water we’ll need to replace is from evaporation from time to time. We’ll put a timer between the pump and the electrical hookup so the water will be on in daylight and off at night.

 

Here we have the water on, making a kind of waterfall for the hummers.  The place we ‘gooed’ last night is good. We still had some drips from the place where we attach the pvc pipe to the side of the tub. Tightening the screws more got rid of the leaks. A happy thing we didn’t expect was the NICE sound the ‘waterfall’ makes!

 

Here’s a close up of the basic tub and waterfall.

Phase 3 will be gathering ‘stuff’ to put in the tub – greenery, rocks, bricks, fun decorations, etc. I’ll take pics again when I’ve gotten the decorating started.

Leave a comment

Filed under Lewis projects

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s